DRAGONÉ | KIRKOROV 2016
Concerts & Touring
WI designed and supplied motion control, customized staging and hardware and also infrastructure for Russian singer and superstar Philipp Kirkorov’s tour - "I" ("Я") - which features a spectacular show design by renowned Belgian-Italian creative director Franco Dragone. WI has previously worked with Dragone on several projects explains project manager Koen Peeters, and for this one the show creators turned to us to provide solutions for several staging conundrums. All of which had to be delivered in an extremely short timeframe. With the tour commencing in Russia 2016, crew visas, paperwork and transportation needed special attention, in addition to all the engineering and physical creative work. Call it a challenge.
Flying Wings
The first WI element of the project was to create 14 aluminium flying wings and a kinetic system to make them move. All of these flying elements have an integrated LED lighting system that allows spectacular lighting effects. All 14 wings were used for 5 shows at The Kremlin in Moscow that launched the tour, after which 10 wings continued as part of the touring set up.
The wing flying system needed to be super lightweight, so the wings are flown in the roof on bespoke tracking trolleys that house 2 zero-speed chain hoists for the 14m high flight path, and run from left to right on 3m span tracking beams. These are all suspended on the production’s trussing and programmed into WI’s control software which regulates the movements and synchronization.
The kick off of the international touring started March 2016 inside the prestigious theatre of the Kremlin Palace.
Stage Sets
The second phase of the project for WI was fabricating the intricate stage - which has flooring at 200, 400 and 600 mm levels - in 3 different variants to deal with the different sized venues on the tour.
This was particularly galvanizing because of the numerous curved shapes involved in all the downstage and offstage elements of each stage entailing the manufacture of many different parts to produce exactly the correct contours when the 3 versions of the stage were fully assembled.
Flooring had to be designed in 3 different levels to deal with the different sized venues on the tour.
Each of the 3 stage levels also encompass LED light boxes on their downstage and offstage edges. Additionally, the 600 mm level contains a trap-door for small stage props and houses 3 hydraulic scissor lifts which are used for performer show moves.
The biggest version of the stage is 18m wide by 12 deep – so far used only at the Kremlin – while the touring version is 13.3m wide by 8.5m deep with a smaller variant at 9.2m wide and also 8.5 deep.
WI also provided the scissor lifts and integrated these into the stage surrounds.
Most elements of the central 600mm level could be re-used across all 3 versions but the 400 and 200 mm sections were completely specific to the different variants of the stage.
Reputed set designer Marcos Viñals Bassols worked for Dragone and produced all the visual designs including the complex staging shapes and artwork for the Marley floor covering.
Fountain Effect
The third scenic element needing the WI touch is a downstage lift with fountain effect that is revealed in the final song of the set.
WI built the 3.2 by 2m aluminium water tank with integrated forklift sleeves, wheels and adjustable feet for easy handling and levelling whilst also housing all the lifting mechanics, one large central water fountain and 8 periphery nozzles with their relevant pumping equipment!
The lift platform is driven up and down by an external pneumatic unit. Water elements were integrated by The Crystal Group from France.
During the show the platform sits level with the stage. For the final song, it is lowered 15 cm into the water and the fountains start, revealing a stunning visual effect invisible up to then during most of the show.
All the flying wings and stage parts have been designed by WI to pack into dollies, clearly marked up to make the build / break-down process as straightforward and efficient as possible for the crews and for local transportation.
Equipment was purchased by the production and WI trained their operator to run and maintain it for the duration of the tour.
KILLING SCHEDULES
The time between receiving the signed contract and the first delivery leaving Belgium for Moscow by road - which took around a week - was just 6 weeks.
WI’s designated team of engineers, project management, administration and planning dealt with this highly complex project from their Heist-op-den-Berg HQ, assisted by the warehouse crew for system assembly. Another 4 people were dispatched to Moscow to aid with the first time assembly.
GREAT TEAM
WI really enjoyed working in close collaboration not only with iconic Belgian- Italian director Franco Dragone himself but also with Dragone’s production manager Guillaume Duflot, technical director Jean Marcouiller, Marcos Viñals and the Kirkorov production led by production manager Ilya Piatrouski and technical manager Sergey Koltsov.
TRIBUTE TO FRANCO
We have dedicated this unique collab to the memory of our friend, creative multi talent and visionary show pro Franco Dragone. Franco was a gamechanger. A source of inspiration for us and for many of our colleagues. His light will continue to shine for the generations to come.
Thank you Franco for letting us be part of your amazing world.