Banner

Rock Werchter / Arras Main square festival

How to conciliate Pink with Rammstein

During the 2010 edition of the Rock Werchter and Arras Main square festivals, Rammstein was scheduled immediately after Pink. Problem: both bands wanted to use their own set, Pink even brought along her own video screen. As such, the changeover between the two acts required some deep thinking. Instead of setting up the screen the night before, the Pink screen had to come on stage just before her show and to be removed immediately after. Enters our WiTrack system. The screens were built next to the stage floor and hung on our tracking system. On cue we pressed the button and they moved on and off stage as requested and advertised. Rammstein never even knew the screens were there.

Media:

01. Drawings

02. Festival

News

Production News

Covering the best of Belgium!

A huge shelter to protect against the rain or the sun.

News image

Read More

Product News

WI-Shelter

The Shelter, now in our rental section!
A sun/raincover for 4000 people, a large dancetent, ...
1500m² Cover

Read More

WI-Turn table

The turn table.
Now available for rent!

Don't hesitate to contact us

Backstage

Join our mailing list