Banner

Rock Werchter / Arras Main square festival

How to conciliate Pink with Rammstein

During the 2010 edition of the Rock Werchter and Arras Main square festivals, Rammstein was scheduled immediately after Pink. Problem: both bands wanted to use their own set, Pink even brought along her own video screen. As such, the changeover between the two acts required some deep thinking. Instead of setting up the screen the night before, the Pink screen had to come on stage just before her show and to be removed immediately after. Enters our WiTrack system. The screens were built next to the stage floor and hung on our tracking system. On cue we pressed the button and they moved on and off stage as requested and advertised. Rammstein never even knew the screens were there.

Related Links

Media:

01. Drawings

02. Festival

News

  • Production News

    Friends of Amstel LIVE!

    A huge telescopic elevated turning bridge!

    News image

    Read More

  • Product News

    Rotating Bridge

    Max span: 20m
    Max speed: 2m/s (at end of bridge)

    Other configurations possible!

    News image

Backstage

  • Join our mailing list